Our client wanted to maintain a strong brand identity for their office spaces, in line with their nationwide gyms. This included refurbishing and re-branding their Leeds offices initially, followed by various other locations, including their London HQ.
sm_banner_900_900_20
Building Interiors were asked to design a multi tenanted reception in Leeds City Centre. Our scheme was chosen above various design options as the design and budget met the brief.
sm_banner_900_900_1
공항의 주형태를 이루는 우아한 지붕선에서는 연속되는 리듬이 느껴지는데, 태평양 해변의 물결치는 파도에서 영감을 얻었다고 합니다. 또한 산타모니카산 방향으로 디자인한 거대한 커튼월은 자연을 한껏 내부로 받아들이는 역할을 합니다.
sm_banner_900_900_35
Objective; To bring staff together. Design, Plan and Fit a new break-out and gaming area to create a vibrant communal space for employees across three buildings.
sm_banner_900_900_11
We took responsibility for the design and installation of the project from consultancy to full project delivery completing on time and on budget.
sm_banner_900_900_29
Mechanical and Electrical works, Supplied and fitted all storage and furniture, Solid and glass partitions and folding dividing walls, Ceilings and flooring, Decoration, and Refreshment area
sm_banner_900_900_9
Full refurbishment of reception, atrium and washrooms including; Strip-out, mechanical & electrical alterations, exposed ceilings, feature lighting, flooring, decoration, bespoke joinery items, furniture and signage.
sm_banner_900_900_10
Through various design team meetings and discussions around design, product specifications and project delivery Building Interiors were successful in meeting all demands that this project presented.
sm_banner_900_900_5
주변에 특별한 테마를 갖고 있지는 않지만 펜트레스는 우리나라 전통 기와집의 우아한 처마 선을 공항의 외부 형태에 접목했습니다.
sm_banner_900_900_4
또한 자연 채광을 최대한 이용하도록 설계해 어떤 공항과도 비교할 수 없이 밝고 활기찬 분위기를 연출했습니다.
sm_banner_900_900_33
New Furniture ranged from stunning Vitra pieces to contemporary systems furniture.
sm_banner_900_900_34
A lot of the details could not be determined until after the strip out phase and the features were uncovered. For this reason, the design process was ongoing on a week to week basis and heavily discussed and agreed with the client.